Providing an air gap between the stucco cladding and the exterior face of the foam sheathing prevents the debacle we got with face sealed exterior insulated finish systems a k a.
Gap between roof sheathing and batt insulation.
Tape the seams in the poly with sheathing tape.
This is best accomplishing by installing baffles on the underside of the roof sheathing in between every rafter prior to installing insulation between the rafters.
For best performance the airspace in the vent chute should be a minimum of 2 in.
If there is a roof leak the insulation will be damaged by the water leaving you with less insulating value.
The moisture is held in place by the insulation which allows for damage to the framing and other building components.
In addition to the air permeable insulation installed directly below the structural sheathing rigid board or sheet insulation shall be installed directly above the structural roof sheathing as specified in table r806 5 for condensation control.
Air impermeable and air permeable insulation.
Press the poly into the sealant.
Ensure that proper ventilation is maintained below the roof sheathing from the soffit vents to the ridge vent at the peak of the roof.
Synthetic stucco photograph 8.
There are lots of ways to insulate a low slope roof and most of them are wrong.
Let s look at stucco cladding over foam sheathing over osb sheathing.
The code calls for a minimum of 1 in.
This will keep the surface warm and help minimize condensation.
First the easy stuff.
Generally spray foams have to be applied by a professional.
You can then apply batt insulation around the foam without worrying too much about the air space.
Updated on april 8 2016.
However it is considered good practice to leave a 1 8 gap between sheets and that is also recommended by apa but it is not required.
Use special airtight electrical boxes see photo tip 5 or seal the poly to the electrical box with acoustical sealant.
Vented roof sheathing.
Unless you re bulk filling rafter bays between 2 10 or 2 8 rafters with closed cell spray foam this approach.
The problem arises with moisture.
T he problem with the insulation against the sheathing expands.
Seal the gap between the bottom plate of the wall and the floor with acoustical sealant or caulk.
In older buildings the usual method is to install fiberglass batts or cellulose on top of the leaky ceiling with a gap of a few inches or sometimes a few feet between the top of the insulation and the roof sheathing.
The air impermeable insulation shall be applied in.