When james hardie siding products butt into wood based materials a 1 8 gap will allow for expansion and contraction of the wood based product.
Gaps between hardi plank siding.
Leave a 1 8 gap between the siding and the trim or other materials to allow for structural movement.
3 8 from plank edge leave 1 8 gap between plank and trim then caulk weather resistive barrier plywood or osb sheathing.
High moisture at time of installation is going to give gaps.
If siding butt joint gaps are due to shrinkage the central problem is one of shrinkage that occurs principally if the siding was not stored properly prior to installation particularly if it got wet.
Flashing installed incorrectly or siding installed without the proper gap between the siding and flashing will both result in water damage and a voided warranty.
It is also difficult to achieve the specified gap in the horizontal overlap.
16 or 24 on center let in bracing weather resistive barrier fastener 1 4 thick lath strip moderate contact or maximum 1 8 gap.
Do not caulk between siding and any built in receiving channels located at or around windows.
James hardie recommends butting field joints together in moderate contact to achieve a continuous looking joint.
When james hardie siding products butt into wood based materials a 1 8 gap will allow for expansion and contraction of the wood based product.
James hardie recommends the use of caulks and sealants that remain permanently flexible.
In contrast caulk manufacturers specify a minimum gap at butt joints which can become more visible as the caulk ages.
Run the siding to the hardietrim board leaving a 1 8 in.
Vertical trim gap caulking.
Gap between the siding and trim.
James hardie recommends the use of caulks and sealants that remain permanently flexible.
The boards would shrink a little bit making the gap 3 16 to 3 8 depending on how much moisture was in them and how close the install gap was to 1 8.
The bottom of the siding should be kept even with the bottom of the trim or if desired the trim may extend below the bottom of the siding.
During my time working for james hardie i very rarely got calls from homeowners that wanted to submit a warranty claim for their hardie siding.
Hardie siding requires a minimum 2 gap from all hard surfaces like decks or rooflines and at least 8 from any soft surfaces like grass dirt or gravel.
This is a common mistake and so easy to avid.
Double wall construction single wall construction.
Remember that most hardie siding problems are caused by improper installation.
Always prime or paint any cut edges that are inserted into a window j channel.
But the siding should never hang below the trim.