Check the soffit and the fascia for any rotten parts.
Gutter flashing install.
Install gutter flashing to improve the performance and prolong the life of your old wooden gutters.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Gutter flashing installation should be seen as a necessary step in the gutter replacement process.
Measure all the sides of the roof line of the house with a tape measure and record the measurements.
Snap the sections together.
Position a ladder on the ground at any corner of the house.
Cut a two inch long notch in the front lip of the gutter with tin snips to join a rain gutter section.
Gutter flashings gutter flashing can be installed just beneath the roofline and inside the gutter.
How to install gutter flashing step 1.
This process prevents rainwater from getting behind the gutter causing rot and decay which will ultimately lead to a roof replacement.
How to install drip edge flashing to a new roof to install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Climb up the ladder and pull back the shingles at.
This should be replaced before installing any gutter flashing.
Slide the ribbed end of the.
Flashings are bent at a 35 degree angle which is statistically the best for diverting water.
They work by stopping water from running behind a gutter and seeping into building materials and the infrastructure of a house.
Since personally installing gutter flashing can help save a lot of costs as compared to getting professional help it should fit just right.
Project step by step 20 cutting the gutter.
It s much easier to join sections on the ground than to work from the top of a ladder.
While the vertical leg should be placed 1 4 1 2 away from the fascia.